Skip to main content
Commercial Office Building — London, a Pledex Group asset intelligence engagement
Demonstration Project · London

Commercial Office Building

Commercial Property · Facilities Management

Demonstration Project. This is an illustrative use case showing how Pledex Group would approach a typical engagement. It does not represent a completed client contract.

The Challenge

A facilities team managing a multi-storey London office relied on outdated, clipboard-based condition reports. Roof inspections required scaffold access and MEWPs — expensive, disruptive and slow. Without a reliable record of condition, supporting insurance, audit or lease renewal was difficult.

The Solution

Pledex would capture the full building envelope — roof, façades and every elevation — in a single site visit. Imagery would be processed into a navigable 3D model, orthomosaic plans and a structured condition report with standardised grading.

Technology Used

Detailed capture and processing.

High-resolution aerial photogrammetry
Orthomosaic plan generation
3D model reconstruction
Structured condition reporting
Project Characteristics

What this engagement would deliver.

Single visit

Capture time on site

None

Working at height

Permanent

Record type

A single capture would deliver a measurable digital record and structured asset documentation. The facilities team could inspect the building on screen, plan maintenance from evidence and hold a reliable condition record.

The Value Delivered

Maintenance planned on screen, fewer site visits, and reliable evidence across insurance, audits and lease renewal.

Get in touch

Have a project in mind?

Share the decision you need to make and we will propose a tailored approach — a senior consultant responds within one working day.